Saturday, July 5, 2008

Tile Floor part 1

Ok, the prep work has been done. DH has the hardiboard down and yesterday (**yawn**) late in the evening we finished putting down the radient heat for the flooring. This means that tomorrow we can start putting down the tile. It has taken a little longer to get to this point but the floor was not level, the whole kitchen had to be gutted so the pipes and electrical wires could be worked on. That being said, we both are very grateful to be at the point where we are. Woo-hoo!! The radient heat wires are finally down!

No comments: